Work

Flagship assets. The full cycle.

Garden State Plaza is not a list of jobs. It is over a decade of experience strategically evolving New Jersey’s premier shopping mall while keeping it operating, and now leading a $300 million mixed-use chapter on the same ground.

Current

Garden State Plaza mixed-use

Garden State Plaza mixed-use construction site, aerial
Phase underway · Paramus, NJ
Garden State Plaza operating while work continues
Still trading through the work

Director of Construction for Unibail-Rodamco-Westfield. Joint venture with Mill Creek Residential. Four phases. Ground broke spring 2026.

The hard part is not the dirt. It is a top-performing mall that cannot take a hit: traffic, holidays, parking, and a center that has to keep trading while a town center is built next to it.

2013

Expansion and parking deck — $110M

Garden State Plaza Deck B and mall expansion interior, 2013–2014
Deck B and mall expansion · 2013–2014

Phased demolition of existing parking, mall entrances, and retail. New five-level, 1,800-space precast parking deck. 90,000 sf building expansion: common area, loading, retail.

2014–2021

Rebuild while open

Structural shoring and foundation work under an operating asset
Shoring and modifying an active foundation · while operating
Garden State Plaza common-area tile replacement completed, 2015
130,000 sf common-area tile · 2015
Garden State Plaza Entrance 7 renovation completed, 2016
Entrance 7 renovation · 2016
Garden State Plaza common area renovation
Common area renovation
Garden State Plaza food court renovation
Food court renovation · 2017
2014

Entrance 10 renovation

$1.5M

Structural and aesthetic façade renovation.

2015

Luxury Lane and active-outdoor reconfiguration

$2.6M / $2M

Retail reconfiguration, structural modifications, accelerated six-week Luxury Lane schedule, electrical service upgrade.

2015

Victoria’s Secret landlord work

$3.1M

Basement slab lowered 15,000 sf. Sixteen spread footings shored, demolished, and lowered. 1,300 cy of earth out. All of it under and beside active retail.

2015

Tile and restrooms

$13M / $5M

130,000 sf common-area tile with public access maintained. Four restroom pairs and two family rooms rebuilt.

2016

IT backbone and seven entrances

$3.8M / $9M

35,000 ft of fiber, 26 IDF cabinets, new MDF and security operations. Flagship Entry 7 among seven entrance renovations.

2017

Food court renovation

$9.5M

23,000 sf food court and play. Restaurants operating every day through the work.

2018

Common area, systems, roof, plant, exterior

$27M / $15M / $10M / $9.5M / $8M

LED and holiday program. Security, BMS, WiFi, music, people counting. 475,000 sf roof. Four boilers, one chiller, 23 RTUs by helicopter. Lots, landscape, EV chargers, wayfinding.

2021

Entry 2 and restaurant expansion

$5M

Entry replacement, restaurant demolition, building addition, tenant prep.

Let It Grow

Other flagship work

Let It Grow waterfront project under construction
Let It Grow · Cover

Selected jobs land here as they are written. Cover stands for the practice until then.

Pocono Wilds

Own it. Run it. Grow it.

Pocono Wilds lodge with fire pit, Tannersville PA
Pocono Wilds · Tannersville, PA
Aerial of Pocono Wilds ten-acre property
Ten acres · room to grow
Pocono Wilds front elevation
Front elevation

330 Learn Road, Tannersville. Short-term rental I own and operate, with plans to add units on the property. Same through-line as the rest of this page: the asset, the ops, and what comes next.

Guest listing and channels are live. The longer development story — why, what, how, plans — lands here when the photos and unit plan are ready.